FDR 13 over UPPER AMMONOOSUC RIVER

MAP 02 · County 007, New Hampshire · Built 1947 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
092202000001019
Year Built
1947
Reconstructed
2006
Length
26.8 m (87.9 ft)
Max Span
13 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Tee Beam
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
$78,000
Total Project Cost
$82,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.