HANNAH NUTTER ROAD over BIG RIVER

0.1 MI FR NEW ROCHESTER · County 001, New Hampshire · Built 2024 · 2 Lanes · 96 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
001401490007300
Year Built
2024
Length
12.9 m (42.3 ft)
Max Span
12.9 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
96
Material
Prestressed Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.