NH 28 over SUNCOOK RIVER

3.6 MI FROM PITTSFIELD TL · County 001, New Hampshire · Built 1957 · 2 Lanes · 8,548 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
001401310010800
Year Built
1957
Reconstructed
2020
Length
19.5 m (64 ft)
Max Span
18.3 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
8,548
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.