DEPOT ROAD over SUNCOOK RIVER

0.07 MI FR NH RTE 126 · County 001, New Hampshire · Built 1950 · 2 Lanes · 96 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
001401260008700
Year Built
1950
Length
11.3 m (37.1 ft)
Max Span
9.8 m
Width
6.8 m (22.3 ft)
Lanes
2
Daily Traffic
96
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.