NH 28 BYPASS over COHAS BROOK

4.45 MI S AUBURN TL. · County 015, New Hampshire · Built 1937 · 2 Lanes · 5,769 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
001300950004400
Year Built
1937
Length
6.7 m (22 ft)
Max Span
6.1 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
5,769
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.