NH 28 BYPASS over LAKE MASSABESIC

2.0 MI JCT RT 121 · County 015, New Hampshire · Built 2001 · 2 Lanes · 7,177 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
001300700010200
Year Built
2001
Length
14.6 m (47.9 ft)
Max Span
13.1 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
7,177
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.