SMITH RIVER ROAD over SMITH RIVER

0.7 MI FROM DANBURY T.L. · County 009, New Hampshire · Built 1937 · 2 Lanes · 130 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000302070004200
Year Built
1937
Reconstructed
2002
Length
32.9 m (107.9 ft)
Max Span
29.3 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
130
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.