NORTH ROAD over SMITH RIVER

.36 MI. NW JCT. 104 AND 4 · County 013, New Hampshire · Built 1936 · 2 Lanes · 511 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
005801380010400
Year Built
1936
Reconstructed
1949
Length
14 m (45.9 ft)
Max Span
13.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
511
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.