US 4 over SMITH RIVER

4.6 MI FROM WILMOT TL · County 013, New Hampshire · Built 1929 · 2 Lanes · 2,087 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
005801380009400
Year Built
1929
Reconstructed
1991
Length
21.3 m (69.9 ft)
Max Span
19.2 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
2,087
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000