FOWLER RIVER ROAD over FOWLER RIVER

1 MI FROM BRISTOL T.L. · County 009, New Hampshire · Built 1954 · 2 Lanes · 96 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000301530014000
Year Built
1954
Reconstructed
1996
Length
19.5 m (64 ft)
Max Span
17.1 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
96
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.