FOWLER RIVER ROAD over FOWLER RIVER

5.2MI FR TUFTONBORO TL · County 009, New Hampshire · Built 1930 · 2 Lanes · 173 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
5
Fair

Bridge Details

Structure #
000301090013500
Year Built
1930
Reconstructed
2004
Length
12.5 m (41 ft)
Max Span
11.9 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
173
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.