FOWLER RIVER ROAD over BOG BROOK

0.1 MI FROM BRISTOL TL · County 009, New Hampshire · Built 1927 · 2 Lanes · 823 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000301740014600
Year Built
1927
Reconstructed
2017
Length
9.1 m (29.9 ft)
Max Span
8.2 m
Width
19.3 m (63.3 ft)
Lanes
2
Daily Traffic
823
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.