I11SB over US95

BOULDER CITY BYPASS · County 003, Nevada · Built 2017 · 2 Lanes · 8,550 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

35.951961, -114.901689

This bridge is in worse condition than 56% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 9 years old.

Nearby Bridges

Bridge Details

Structure #
I3162S
Year Built
2017
Length
62.8 m (206 ft)
Max Span
32 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
8,550
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.