I11 over DRAINAGE
BOULDER CITY · County 003, Nevada · Built 2017 · 4 Lanes · 17,100 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.944139, -114.884286
This bridge is in worse condition than 56% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 9 years old.
Nearby Bridges
I11 over DRAINAGE
Built 2017
I11 over DRAINAGE
Built 2017
I11SB over US95
Built 2017
I11NB over US95
Built 2017
I11 over DRAINAGE
Built 2018
I11 over DRAINAGE
Built 2017
I-11 NB over SILVERLINE ROAD
Built 2017
INTERSTATE 11 over SILVERLINE ROAD
Built 2017
US 93N over US 95
Built 1976
US 93S over US 95
Built 1976
Bridge Details
- Structure #
- B3164
- Year Built
- 2017
- Length
- 8.1 m (26.6 ft)
- Max Span
- 3.7 m
- Lanes
- 4
- Daily Traffic
- 17,100
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.