INTERSTATE 11 over SILVERLINE ROAD

OUTSIDE OF BOULDER CITY · County 003, Nevada · Built 2017 · 3 Lanes · 8,550 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

35.957656, -114.909522

This bridge is in worse condition than 56% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 9 years old.

Nearby Bridges

Bridge Details

Structure #
H2955S
Year Built
2017
Length
22.3 m (73.2 ft)
Max Span
21.6 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
8,550
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.