NEVADA PACIFIC PKW over I 80

EAST OF FERNLEY · County 019, Nevada · Built 2009 · 2 Lanes · 1,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

39.623278, -119.2009

This bridge is in worse condition than 37% of bridges in County 019. The average bridge in Nevada is 0 years old; this one is 17 years old.

Nearby Bridges

Bridge Details

Structure #
I2921
Year Built
2009
Length
58 m (190.3 ft)
Max Span
28.3 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
1,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.