I 80E over VINE ST GRADE SEP MP47

NEAR FERNLEY · County 019, Nevada · Built 1963 · 2 Lanes · 10,850 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

39.614475, -119.236194

This bridge is in worse condition than 37% of bridges in County 019. The average bridge in Nevada is 0 years old; this one is 63 years old.

Nearby Bridges

Bridge Details

Structure #
H 844E
Year Built
1963
Length
28.3 m (92.8 ft)
Max Span
10.7 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
10,850
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.