US 95A over UPRR
FERNLEY · County 019, Nevada · Built 2006 · 4 Lanes · 29,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.605006, -119.226783
This bridge is in worse condition than 37% of bridges in County 019. The average bridge in Nevada is 0 years old; this one is 20 years old.
Nearby Bridges
I 80E over US 95A
Built 1963
I 80W over US 95A
Built 1963
I 80E over VINE ST GRADE SEP MP47
Built 1963
I 80W over VINE ST GRADE SEP MP47
Built 1963
US 95A over TRUCKEE CANAL
Built 2006
NEVADA PACIFIC PKW over I 80
Built 2009
I 80E over SPRR
Built 1963
I 80W over SPRR
Built 1963
I 80E over SR427 MAIN ST
Built 1963
I 80W over SR427 MAIN ST
Built 1963
Bridge Details
- Structure #
- G 19
- Year Built
- 2006
- Length
- 78.6 m (257.9 ft)
- Max Span
- 35.1 m
- Width
- 26.2 m (86 ft)
- Lanes
- 4
- Daily Traffic
- 29,500
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.