SB CONN TO EB 215 over I215

S OF MCCARRAN AIRPORT · County 003, Nevada · Built 2017 · 2 Lanes · 16,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
I2885R
Year Built
2017
Length
586.1 m (1922.9 ft)
Max Span
82.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
16,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.