I 215 RAMP over CITY ST RAMP
LAS VEGAS · County 003, Nevada · Built 1994 · 1 Lanes · 13,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
36.061611, -115.145164
This bridge is in worse condition than 82.9% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 32 years old.
Nearby Bridges
SB CONN TO EB 215 over I215
Built 2017
I 215N over SR171 AIRPORT CONNECT
Built 1994
US 215S over MCCARRAN A/P CONNECTOR
Built 2017
RMP WARM SPR-215N over PARADISE RD
Built 1995
I 215 BELT WAY over PARADISE RD
Built 1995
I 215 BELT WAY over PARADISE RD
Built 1995
I 215S over WARM SPRINGS RD
Built 1995
I 215N over WARM SPRINGS RD
Built 1995
PILOT RD over SR 171 AIRPORT CONNECT
Built 1994
GRIER DR over SR 171 AIRPORT CONNECT
Built 1994
Bridge Details
- Structure #
- I1973R
- Year Built
- 1994
- Length
- 125 m (410.1 ft)
- Max Span
- 35.1 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 1
- Daily Traffic
- 13,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,072,000
- Total Project Cost
- $1,608,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.