I 215S over WARM SPRINGS RD

LAS VEGAS · County 003, Nevada · Built 1995 · 6 Lanes · 74,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
I1972S
Year Built
1995
Length
58.5 m (191.9 ft)
Max Span
58.5 m
Width
34.4 m (112.9 ft)
Lanes
6
Daily Traffic
74,750
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.