I 580 over RMP I80E TO US395N

RENO · County 031, Nevada · Built 1969 · 6 Lanes · 163,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
I1149
Year Built
1969
Length
43.9 m (144 ft)
Max Span
20.4 m
Width
37.5 m (123 ft)
Lanes
6
Daily Traffic
163,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$142,300,000
Total Project Cost
$213,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.