I 580 over SR647 4TH ST SPRR

RENO · County 031, Nevada · Built 1971 · 7 Lanes · 163,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
G1233
Year Built
1971
Length
140.5 m (461 ft)
Max Span
29 m
Width
20.7 m (67.9 ft)
Lanes
7
Daily Traffic
163,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,681,000
Total Project Cost
$5,522,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.