I 580 RAMP over SR647 4TH ST SPRR

RENO · County 031, Nevada · Built 1971 · 2 Lanes · 24,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
G1233R
Year Built
1971
Length
140.2 m (460 ft)
Max Span
29 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
24,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,191,000
Total Project Cost
$1,786,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.