I 580 RAMP over SR647 4TH ST SPRR
RENO · County 031, Nevada · Built 1971 · 2 Lanes · 24,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
39.533467, -119.787253
This bridge is in worse condition than 90.5% of bridges in County 031. The average bridge in Nevada is 0 years old; this one is 55 years old.
Nearby Bridges
I 580 over SR647 4TH ST SPRR
Built 1971
I 580S over SR647 4TH ST SPRR
Built 2022
I 580 over SR667 & TRUCKEE RVR
Built 1971
I 580 over RMP I80E TO US395N
Built 1969
I580S over Truckee Rvr Kietzke Ln
Built 2022
SR 667/KIETZKE LN over TRUCKEE RIVER
Built 1966
GREG ST over TRUCKEE RIVER
Built 1980
SR 667/KIETZKE LN over TRUCKEE RIVER
Built 1966
US 395 over I 80
Built 1969
RMP I80E TO US395N over I 80
Built 1969
Bridge Details
- Structure #
- G1233R
- Year Built
- 1971
- Length
- 140.2 m (460 ft)
- Max Span
- 29 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 24,100
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,191,000
- Total Project Cost
- $1,786,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.