SWENSON ST over PARADISE RD

MCCARRAN AIRPORT L V · County 003, Nevada · Built 1985 · 2 Lanes · 39,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
H1816
Year Built
1985
Length
103.6 m (339.9 ft)
Max Span
38.1 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
39,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$1,433,000
Total Project Cost
$2,150,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.