SWENSON ST over PARADISE RD
MCCARRAN AIRPORT L V · County 003, Nevada · Built 1985 · 2 Lanes · 39,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
36.092458, -115.147872
This bridge is in worse condition than 82.9% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 41 years old.
Nearby Bridges
ACCESS ROAD over ACCESS ROAD to T1 2
Built 2012
AIRPORT ENTRANCE over KITTY HAWK DR
Built 1985
AIRPORT SERVICE DR over AIRPORT SERVICE DR
Built 1985
PARADISE RD over RUSSELL RD
Built 1994
RUSSELL RD over FUTURE AIRPORT ACCESS RD
Built 2007
BAGGAGE CLAIM N. over PLAZA DRIVE
Built 1996
DAILY BRIDGE over PLAZA DRIVE
Built 1996
EXPRESS NORTH BRID over PLAZA DRIVE
Built 1996
ARRIVALS CURB 2 over PLAZA DRIVE
Built 1983
DEPARTURES CURB over NORTH BAGGAGE TUNNEL
Built 1998
Bridge Details
- Structure #
- H1816
- Year Built
- 1985
- Length
- 103.6 m (339.9 ft)
- Max Span
- 38.1 m
- Width
- 15.5 m (50.9 ft)
- Lanes
- 2
- Daily Traffic
- 39,000
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $1,433,000
- Total Project Cost
- $2,150,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.