BUFFALO DRIVE over CHEYENNE CHANNEL

LAS VEGAS · County 003, Nevada · Built 1990 · 7 Lanes · 17,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B1889
Year Built
1990
Length
9.1 m (29.9 ft)
Max Span
9.1 m
Width
31.1 m (102 ft)
Lanes
7
Daily Traffic
17,100
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.