US 95 over GOWAN RD

NORTH LAS VEGAS · County 003, Nevada · Built 1977 · 6 Lanes · 70,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
H1217N
Year Built
1977
Length
38.1 m (125 ft)
Max Span
17.1 m
Width
27.4 m (89.9 ft)
Lanes
6
Daily Traffic
70,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.