BREAKWATER DRIVE over LAKES 2 AND 5

SUN CITY · County 003, Nevada · Built 1988 · 2 Lanes · 3,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B2171
Year Built
1988
Length
15.8 m (51.8 ft)
Max Span
7.9 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
3,300
Material
Concrete
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.