N SEVENTH AVE over INT N 7TH AVE-I 90

BOZEMAN-N SEVENTH AVE · County 031, Montana · Built 2014 · 6 Lanes · 26,020 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
U01207001+02231
Year Built
2014
Length
61 m (200.1 ft)
Max Span
30.5 m
Width
30.8 m (101 ft)
Lanes
6
Daily Traffic
26,020
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$585,000
Total Project Cost
$878,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.