I 90 over WALKING PATH

BOZEMAN · County 031, Montana · Built 2011 · 4 Lanes · 21,232 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
I00090307+08431
Year Built
2011
Length
9.7 m (31.8 ft)
Max Span
9.7 m
Width
46 m (150.9 ft)
Lanes
4
Daily Traffic
21,232
Material
Concrete
Design
Arch - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.