L ST over E GALLATIN RIVER 091

NE BOZEMAN · County 031, Montana · Built 2001 · 2 Lanes · 1,761 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
L16010000+05001
Year Built
2001
Length
9.8 m (32.2 ft)
Max Span
9.3 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
1,761
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.