BUNDY RD over YELLOWSTONE RIVER

3M NW POMPEY`S PILLAR · County 111, Montana · Built 2001 · 2 Lanes · 87 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
S00568001+09601
Year Built
2001
Length
245.4 m (805.1 ft)
Max Span
41 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
87
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.