S 28TH RD over SEP I 94 005

3M SW POMPEY`S PILLAR · County 111, Montana · Built 1968 · 2 Lanes · 72 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

45.972417, -108.027681

This bridge is in worse condition than 35.2% of bridges in County 111. The average bridge in Montana is 0 years old; this one is 58 years old.

Nearby Bridges

Bridge Details

Structure #
L56138001+03201
Year Built
1968
Length
84.1 m (275.9 ft)
Max Span
18.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
72
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.