I 94 over HUNTLEY CANAL

2.5M W POMPEYS PILLAR · County 111, Montana · Built 1968 · 2 Lanes · 2,611 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
I00094020+05302
Year Built
1968
Length
36 m (118.1 ft)
Max Span
20.1 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
2,611
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.