SOLLID RD over PONDERA COULEE
1M E CONRAD · County 073, Montana · Built 1971 · 2 Lanes · 572 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
48.174028, -111.919439
This bridge is in worse condition than 14.6% of bridges in County 073. The average bridge in Montana is 0 years old; this one is 55 years old.
Nearby Bridges
SOLLID RD over SEP SOLLID ROAD-I 15
Built 1972
I 15 over PONDERA COULEE
Built 1972
I 15 over PONDERA COULEE
Built 1972
BLAZEN RD over PONDERA COULEE 079
Built 2004
S 21-S MAIN ST over PONDERA COULEE
Built 1934
S 21 over RR
Built 1972
S 21 over INT CONRAD I 15
Built 1972
S 21 over IRRIGATION CANAL
Built 1988
PRIMROSE RD N over PONDERA COULEE 018
Built 1979
OLD SHELBY RD over DRY FK MARIAS RIVER 013
Built 1970
Bridge Details
- Structure #
- S00218001+01001
- Year Built
- 1971
- Length
- 30.5 m (100.1 ft)
- Max Span
- 15.2 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 572
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.