S 21-S MAIN ST over PONDERA COULEE
CONRAD BY FLEET SUPPLY · County 073, Montana · Built 1934 · 2 Lanes · 1,245 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
48.163717, -111.950119
This bridge is in worse condition than 14.6% of bridges in County 073. The average bridge in Montana is 0 years old; this one is 92 years old.
Nearby Bridges
S 21 over RR
Built 1972
BLAZEN RD over PONDERA COULEE 079
Built 2004
S 21 over INT CONRAD I 15
Built 1972
S 21 over IRRIGATION CANAL
Built 1988
I 15 over PONDERA COULEE
Built 1972
SOLLID RD over SEP SOLLID ROAD-I 15
Built 1972
I 15 over PONDERA COULEE
Built 1972
SOLLID RD over PONDERA COULEE
Built 1971
HILLSIDE RD over NO NAME DITCH 049
Built 1960
DERBY DR over NO NAME COULEE 027
Built 2005
Bridge Details
- Structure #
- P00021003+08001
- Year Built
- 1934
- Reconstructed
- 1989
- Length
- 11.5 m (37.7 ft)
- Max Span
- 4.7 m
- Lanes
- 2
- Daily Traffic
- 1,245
- Material
- Steel
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.