PRIMROSE RD N over PONDERA COULEE 018
4M NE CONRAD · County 073, Montana · Built 1979 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
48.187797, -111.875361
This bridge is in worse condition than 53.1% of bridges in County 073. The average bridge in Montana is 0 years old; this one is 47 years old.
Nearby Bridges
KELLY RD over PONDERA COULEE 019
Built 1960
SOLLID RD over PONDERA COULEE
Built 1971
OLD SHELBY RD over DRY FK MARIAS RIVER 013
Built 1970
SOLLID RD over SEP SOLLID ROAD-I 15
Built 1972
I 15 over PONDERA COULEE
Built 1972
I 15 over PONDERA COULEE
Built 1972
I 15 over RR
Built 1972
I 15 over RR
Built 1972
I 15 over DRY FORK MARIAS RIVER
Built 1972
I 15 over DRY FORK MARIAS RIVER
Built 1972
Bridge Details
- Structure #
- L37107000+09001
- Year Built
- 1979
- Length
- 14.6 m (47.9 ft)
- Max Span
- 7 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.