IRR - US 2 over FLYNN CREEK
8M W WOLF POINT · County 085, Montana · Built 1956 · 2 Lanes · 1,479 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
48.071058, -105.825675
This bridge is in worse condition than 75.4% of bridges in County 085. The average bridge in Montana is 0 years old; this one is 70 years old.
Nearby Bridges
IRR BIA RTE 8 over OSWEGO SOUTH MAIN CANAL
Built 1983
IRR BIA RTE 10 over OSWEGO EAST MAIN CANAL
Built 1972
IRR - US 2 over OSWEGO CREEK
Built 1973
IRR BIA ROUTE 1 over MAIN CANAL
Built 1976
IRR - US 2 over DRAINAGE
Built 1970
S 528 over PRAIRIE ELK CREEK 021
Built 1972
IRR BIA ROUTE 1 over MAIN CANAL
Built 1972
IRR BIA RTE 30 over MAIN CANAL
Built 1983
S 528 over SAND CREEK 022
Built 1974
IRR - US 2 over WOLF CREEK
Built 1956
Bridge Details
- Structure #
- P00001581+09571
- Year Built
- 1956
- Length
- 17.8 m (58.4 ft)
- Max Span
- 5.8 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,479
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $133,000
- Total Project Cost
- $166,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.