IRR BIA RTE 10 over OSWEGO EAST MAIN CANAL

1.6 KM SE OF OSWEGO · County 105, Montana · Built 1972 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000000C602
Year Built
1972
Length
12.2 m (40 ft)
Max Span
12.2 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Tee Beam
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.