S 528 over PRAIRIE ELK CREEK 021
10M SW WOLF POINT · County 055, Montana · Built 1972 · 1 Lanes · 76 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.999167, -105.867253
This bridge is in worse condition than 23.3% of bridges in County 055. The average bridge in Montana is 0 years old; this one is 54 years old.
Nearby Bridges
IRR BIA RTE 8 over OSWEGO SOUTH MAIN CANAL
Built 1983
IRR BIA ROUTE 1 over MAIN CANAL
Built 1976
IRR BIA RTE 10 over OSWEGO EAST MAIN CANAL
Built 1972
IRR - US 2 over OSWEGO CREEK
Built 1973
IRR - US 2 over DRAINAGE
Built 1970
IRR BIA ROUTE 1 over MAIN CANAL
Built 1972
IRR BIA RTE 30 over MAIN CANAL
Built 1983
WELDON RD over REMUDA CREEK 018
Built 1979
IRR - US 2 over FLYNN CREEK
Built 1956
IRR BIA RTE 30 over MAIN CANAL
Built 1983
Bridge Details
- Structure #
- L28206017+09001
- Year Built
- 1972
- Length
- 42.5 m (139.4 ft)
- Max Span
- 21.3 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 76
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $133,000
- Total Project Cost
- $200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.