EAGLE PASS TRAIL over PABLO FEEDER CANAL 104

9M NE ST IGNATIUS · County 047, Montana · Built 1977 · 2 Lanes · 100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
L24357004+00001
Year Built
1977
Length
9.4 m (30.8 ft)
Max Span
9.1 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
100
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.