IRR - US 93 over POST CREEK
6M N ST IGNATIUS · County 047, Montana · Built 1933 · 2 Lanes · 8,158 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
47.394878, -114.097247
This bridge is in worse condition than 75% of bridges in County 047. The average bridge in Montana is 0 years old; this one is 93 years old.
Nearby Bridges
FISH HATCHERY RD over POST CREEK 075
Built 1920
EAST POST CREEK RD over POST CREEK 080
Built 2022
DELANEY WAY over POST CREEK 074
Built 2017
MCDONALD LAKE RD over POST CREEK 078
Built 2015
IRR - US 93 over NINE PIPE RESERVOIR
Built 1933
OLD FREIGHT RD over POST CREEK 053
Built 2016
HILLSIDE ROAD over POST CREEK
Built 2023
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
US 93 over WILDLIFE UPASS-DRAINAGE
Built 2006
EAGLE PASS TRAIL over S KICKING HORSE RES 010
Built 1991
Bridge Details
- Structure #
- P00005037+07681
- Year Built
- 1933
- Reconstructed
- 1955
- Length
- 15.5 m (50.9 ft)
- Max Span
- 7.9 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 8,158
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $93,000
- Total Project Cost
- $140,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.