GALENA GULCH RD over BOULDER RIVER 016
4M E BASIN · County 043, Montana · Built 2003 · 2 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
46.26, -112.190269
This bridge is in worse condition than 19.9% of bridges in County 043. The average bridge in Montana is 0 years old; this one is 23 years old.
Nearby Bridges
I 15 over BOULDER RIVER
Built 1980
I 15 over BOULDER RIVER
Built 1980
I 15 over INT HIGH ORE
Built 1982
I 15 over BOULDER RIVER
Built 1980
GALENA GULCH ROAD over BOULDER RIVER
Built 1957
I 15 over SEP GALENA GULCH ROAD
Built 1981
HIGH ORE RD over BOULDER RIVER 038
Built 1980
I 15 over BOULDER RVR-ACCESS RD
Built 1980
I 15 over BOULDER RVR-ACCESS RD
Built 1980
I 15 over BOULDER RIVER
Built 1980
Bridge Details
- Structure #
- L22099004+03001
- Year Built
- 2003
- Length
- 47 m (154.2 ft)
- Max Span
- 23.5 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.