I 15 over SEP GALENA GULCH ROAD

4.3M E BASIN · County 043, Montana · Built 1981 · 4 Lanes · 3,856 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
I00015161+01511
Year Built
1981
Length
23.8 m (78.1 ft)
Max Span
9.1 m
Width
26.9 m (88.3 ft)
Lanes
4
Daily Traffic
3,856
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.