I 15 over BOULDER RVR-ACCESS RD

2.5M W BOULDER · County 043, Montana · Built 1980 · 2 Lanes · 1,928 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
I00015161+06912
Year Built
1980
Length
61.2 m (200.8 ft)
Max Span
26.8 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
1,928
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.