LIMA DAM RD over RED ROCK RIVER 007

6M E LIMA · County 001, Montana · Built 1982 · 2 Lanes · 118 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
L01205005+02001
Year Built
1982
Length
13.7 m (44.9 ft)
Max Span
9.8 m
Width
5.9 m (19.4 ft)
Lanes
2
Daily Traffic
118
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$105,000
Total Project Cost
$158,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.