I 15 over SEP RR

1.9M S LIMA · County 001, Montana · Built 2016 · 2 Lanes · 1,771 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000001010
Year Built
2016
Length
170.8 m (560.4 ft)
Max Span
40.9 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
1,771
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$856,000
Total Project Cost
$1,284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.