LIMA DAM ROAD over RED ROCK RIVER
5M E LIMA · County 001, Montana · Built 2019 · 2 Lanes · 118 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
44.654669, -112.503258
This bridge is in worse condition than 24.2% of bridges in County 001. The average bridge in Montana is 0 years old; this one is 7 years old.
Nearby Bridges
LIMA DAM RD over RED ROCK RIVER 007
Built 1982
I 15 over INT SNOWLINE STOCK LN
Built 1981
I 15 over INT SNOWLINE STOCK LN
Built 1981
I 15 over SEP RR
Built 2016
I 15 over SEP RR
Built 1980
I 15 over INT LIMA-BAILEY ST
Built 1959
I 15 over INT LIMA-BAILEY ST
Built 1980
STEEL BRIDGE LN over RED ROCK RIVER 084
Built 2024
I 15 over SEP GOSMAN LANE
Built 1967
I 15 over SEP GOSMAN LANE
Built 1971
Bridge Details
- Structure #
- 000000201902165
- Year Built
- 2019
- Length
- 11.5 m (37.7 ft)
- Max Span
- 11.3 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 118
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.