LIMA DAM ROAD over RED ROCK RIVER

5M E LIMA · County 001, Montana · Built 2019 · 2 Lanes · 118 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000201902165
Year Built
2019
Length
11.5 m (37.7 ft)
Max Span
11.3 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
118
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.