I 15 over SEP AMAZON ROAD
3.7M N BOULDER · County 043, Montana · Built 1973 · 2 Lanes · 2,534 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.284208, -112.099219
This bridge is in worse condition than 19.9% of bridges in County 043. The average bridge in Montana is 0 years old; this one is 53 years old.
Nearby Bridges
I 15 over SEP AMAZON RD
Built 1973
I 15 over SEP DEPOT HILL ROAD
Built 1973
I 15 over SEP DEPOT HILL ROAD
Built 1973
S 69 over INT BOULDER I 15
Built 1973
S 69 over BOULDER RIVER
Built 2003
I 15 over BOULDER RIVER
Built 1979
I 15 over BOULDER RVR-ACCESS RD
Built 1980
I 15 over BOULDER RVR-ACCESS RD
Built 1980
I 15 over BOULDER RIVER
Built 1980
I 15 over SEP GALENA GULCH ROAD
Built 1981
Bridge Details
- Structure #
- I00015167+07042
- Year Built
- 1973
- Length
- 24.1 m (79.1 ft)
- Max Span
- 9.1 m
- Width
- 13.5 m (44.3 ft)
- Lanes
- 2
- Daily Traffic
- 2,534
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.