PHILLIPS ROAD over SILVER CREEK

SEC 34 T12N R 5W · County 163, Mississippi · Built 2015 · 2 Lanes · 40 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
SA820000000A185
Year Built
2015
Length
37.6 m (123.4 ft)
Max Span
9.4 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
40
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$248,000
Total Project Cost
$360,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.